The 44 metre dredger, Kapua was hauled out at Heron Ship Repair for its two year intermediate survey. A number of minor structural repairs were implemented around the hull plates. The survey was concluded with a full sandblast and painting of the topsides and hull below the waterline. The Kapua was released back to the briny to continue the hard labour demanded of such working craft.