Recently we performed a general full term survey on the San Columbia, a 205 tonne 33m trawler.
Following the survey, we went ahead with removal of the main drive shaft and lifted the two intermediate shafts for inspection of the bearings.
Removal of the rudder and associated components was required next. We then carried out hull corrosion repairs in numerous areas.
Next we surveyed then carried out repairs to the main booms and lifting equipment.
Last but not least, we sandblasted the San Columbia and repainted her, to look spectacular in the new Sanford’s blue colour scheme.