The 24 metre tug, Tug Tai Pari was on the hard last month for her first five-year Out-of-Water survey. The vessel’s Rolls Royce drive units were stripped down and main shaft seals replaced. Her water cooling system was dropped out to allow structural modifications to the barrier frames. Numerous small modifications and repairs were carried out around the wheel-house and top decks. With the survey complete, a full sandblast and the application of a fresh paint system was executed around the top decks, as well as the entire hull above and below the waterline.